Projects

Get to know us, and some of our work. We have strong roots in this area, and are proud to serve our clients.

We’re here to answer all your questions, and to help you take care of your business.

VA San Diego

San Diego, CA | $7.3M | 2023

Upgrade Domestic Water

Legionnaire prevention throughout hospital buildings 1, 2, and 11. Remove and replace all domestic hot and cold-water valves. Remove all mixing valves on all sinks and replace them with anti-scold mixing valves. Replace domestic hot water GPM balancing valves with temperature balancing valves to maintain domestic hot water throughout each building. Addition of a 70-ton air cooled scroll chiller to condition the domestic cold water throughout building and a new cold water return line. Add water monitoring stations throughout each floor in buildings 1, 2, and 11 with provided service, maintenance and calibration.

VA San Diego

San Diego, CA | $2.4M | 2023

500-Ton Absorption Chiller Replacement

Replace an existing 500-ton absorption chiller with a new Trane absorption chiller. Refurbish existing cooling towers. Provide and install new chilled water pumps and condenser pumps.

Hitzke Development

San Diego, CA | $1M | 2024

Tranquility at Post 310

Provide HVAC for 43 apartment units in two different buildings. One three-story building consists of 18 apartments on the second and third floors. American Legion Post 310 on the first floor with a fully functional commercial kitchen. The second building is a four-story building that contains 25 apartments and amenities for residents.

GSA

San Ysidro, CA | $670,000 | 2024

Lab Expansion

Retro-fit lab testing facility for the GSA. Provide new 10-ton AC unit with fume hood, phoenix valves, and fume snorkels.

Naval Base Point Loma

Point Loma, CA | $525,000 | 2023

Air Handlers

Remove and replace existing 20,000 CFM air handlers, chilled water piping, ductwork, exterior louvers, and controls.

Herman Office

San Diego, CA | $245,000 | 2023

HVAC and Plumbing Design for Second Floor Offices

HVAC work consisted of 3 package units with individual zone control for offices.

Plumbing work consisted of 2 new bathrooms and 1 common kitchen breakroom.

National Oceanic and Atmospheric Administration

Yuma, AZ | $160,000 | 2023

10-Ton CRAC Unit

Remove and replace existing 10-ton CRAC unit for satellite communications tower.

VA El Paso

El Paso, TX | $55,000 | 2022

Chiller Coil Replacement

Service and Repair existing chiller. Fix existing coil condensing leaks and recharge system.

Barstow Armory, California Military Dept.

Barstow, CA | $42,000 | 2022

Replace existing mini split systems.